ZEOLITE FACTORY - Tallinn, Estonia

Construction information


Designed by: DP "Inzenjering", "GOSA Projmetal" 
Main Designer: G. Maric, BSc (arch.)
Main Designers of individual stages: S. Petrovic, BSc (civil eng.) and R. Duvljak, BSc (civil eng.)
Main Contractor: "Generalexport" and "GOSA Projmetal"
Main Sub-contractors: "GOSA Montaza" and local companies 
Purpose of the Project: Zeolite production (a component for detergent)
Years of Construction: 1990-1991
  

Project information

 
THE STRUCTURE is built as a steel construction with ceramsite and brick walls. The facade walls and the roofing are of steel sandwich-type sheeting. In two out of seven constructed and interconnected structures, there are crane paths and mounted cranes. The structures are of different heights (20 to 30 m), depending on the technological process.

§ Beside the factory, there are built: warehouses, storage bunke and mixers, drying and packing premises, etc.

§ The production of zeolite is under the technology prepared by the Institute for Physical Chemistry in Beograd, and the company "Birac" from Zvornik. The whole complex is provided with 
necessary installations for strong and weak current, heating and ventilation, water supply and sewage.
 

Related photos

Industrial And Energy Supply Plants - ZEOLITE FACTORY - Tallinn, Estonia

©2001 - 2006 YUBuild Group. All rights reserved. Legal information.
E-mail our webmaster if you have questions or problems regarding this Web site.