Close window | Table of Contents | Home | Contact us | Recommend us
  

I - Industrial And Energy Supply Plants

COMPUTER EQUIPMENT FACTORY - Yerevan, Armenia

Construction information


Designed by: Simon-Cavres Ltd. - London 
Main Designer: Simon-Cavres Ltd. - London 
Main Contractor: "Generalexport"
Main Sub-contractors: "Komgrap", "Janko Lisjak", "GOSA", "Elektron" 
Employer: "Tehnopromimport" - Moscow
Purpose of the Project: Computer Equipment Factory 
Years of Construction: 1988-1992.
  

Project information

 
THE COMPUTER equipment factory is a large complex situated on an area of 1.000,000 m2. The annual capacity of the factory is 25,000 electronic control systems or computers for automatic regulation of production processes in industry. The construction and equipping of this project was specific, having in view the fact that besides the technology offered by General Electric Company, 
many Russian components had to be built in because it had been planned to adapt the final product.

§ The hall is provided with a double electronic control and regulation system of all the installations, and the production process is automatized to great extent by means of automatic 
trolleys or small robots. The basic scheme of the entire process or all levels (from the first input components, via subassemblies and assemblies to the final product) is in fact input-control-assembly-control.
  

Related photos

Industrial And Energy Supply Plants - COMPUTER EQUIPMENT FACTORY - Yerevan, Armenia
Industrial And Energy Supply Plants - COMPUTER EQUIPMENT FACTORY - Yerevan, Armenia
Industrial And Energy Supply Plants - COMPUTER EQUIPMENT FACTORY - Yerevan, Armenia
Industrial And Energy Supply Plants - COMPUTER EQUIPMENT FACTORY - Yerevan, Armenia

©2001 - 2006 YUBuild Group. All rights reserved. Legal information.
E-mail our webmaster if you have questions or problems regarding this Web site.