1. LOOP "TRUPALE" 2. SECTION TRUPALE - KOCANI
Designed by: Institute for Roads
Main Designer (100 p TRUPALE): B.
Momeilovic, BSc (civil eng.)
Main Contractors: GP "Novi Autoput", PZ "Jugoslaviaput"
(100 p "Trupale"), GP "Ratko
Mitrovic" (section Trupale-Kocani)
Main Sub-contractors: "Minel", "Jugoslaviaput", "Planum",
"Partizanski put", "Boja".
Purpose of the Project: Highway
Years of Construction: 1989-1990
|
|
THE TRUPALE LOOP
§ On the highway Beograd-Nis-Skopje (E-75), section
Trupale-Batusnica, a Trupale loop was built to enable smooth
traffic on the international sections Beograd-Nis,
Nis-Sofija and Nis-Thessaloniki. At present, it is the only one built junction
on the highways in Serbia from which traffic branches towards
Serbia , Greece and Bulgaria.
§ As regards the leveling solution, the Trupale loop is in
three Levels and harmoniously matches the surrounding terrain.
§ The asphalt surfacing covers 155.334 m2. The road width is
2x11.00 m, the median strip 4 m, shoulders 2x1.0 m.
§ Other important characteristics: excavation 457,723
m3, embankment 46,936 m3, roadbase 98,550
m3, bito-gravel 7,447 tons, bito-aggregate 2,608 tons, asphalt-concrete 24,835
tons curb 18/24, 24/24 cm, 2,291 m, concrete b fitters 4,396 m, pipe
culverts of various profiles 2,749 m.
SECTION TRUPALE-KOCANI
§ The highway section Trupale-Kocani was built by "Ratko
Mitrovic" with the supporting structures, flyovers, loops and
bridges. The bridge across the river Juzna Morava was built
which with the total span of 140 m and the embankment height (at the
approach to the structure) enables future water communication.
§ Other important characteristics: 3,910 thousands cubic meters
was excavated. Approx. 673,000 m2 of pavement was built and
160 linear meters of bridge structures.
|