G - Hydro-Engineering Projects

THE PORT OF RENI - The Danube, Ukraine

Construction information


Main Designer: Designing group "Ratko Mitrovic": Lj. Gavrilovic, BSc (arch.); A. Babovic, BSc larch.); E. Hribsek, BSc (arch.) and Designing Bureau "Ivan Milutinovic": R. Babovic, BSc (arch.)
Main Contractor: "Generalexport"
Main Sub-contractors: "Ivan Milutinovic" - PIM (marine works) and "Ratko Mitrovic" (for land works)
Employer: Ministry of sea fleet USSR
Purpose of the Project: Port for goods traffic
Years of Construction: I phase: 1983-1984, II phase: 1985-1987, III phase: 1988-1989
  

Project information

 
WITHIN the port of Reni, PIM built the following:
- operational hall for docking of cargo ships total length 1,200 m;
- operational shore for clocking of boats, 100 m.

§ The structure was designed as a reinforced concrete semi-prefabricated slab supported on four rows of reinforced concrete piles of octagonal cross section 60x60 m, 1,700 pcs., 34,000 m, containing 51,700 m3 of concrete.

§ The building was performed in two phases: manufacture of piles and other prefabricated elements in Serbia , shiping to the site, pile driving and assembly of the elements.

§ The output of "Generalexport" and '`Ratko Mitrovic" included: 
- open and covered storages;
- new reloading capacities including cranes and rail paths; 
- office building;
- port infrastructure, automatic telephone exchange; 
- refrigerator room, capacity 3,000 tons yearly;
- sports hall, hospital and a 650-flat house block.
  

Related photos

Hydro-Engineering Projects - THE PORT OF RENI - The Danube, Ukraine
Hydro-Engineering Projects - THE PORT OF RENI - The Danube, Ukraine
Hydro-Engineering Projects - THE PORT OF RENI - The Danube, Ukraine

©2001 - 2006 YUBuild Group. All rights reserved. Legal information.
E-mail our webmaster if you have questions or problems regarding this Web site.