Designed by: Institute for Water Management
"Jaroslav Cerni"
Main Designer: Mihajlo Radosavljevic, BSc (civil eng.)
Main Designers of individual stages: Sonja
Pavlovic, BSc (civil eng.), Dragan
Zdravkovic, BSc (civil. eng.), Dejan
Divac, BSc (civil eng.)
Employer: Javno preduzece "Rzav" (Public Co. "Rzav")
Main Contractors: "Ratko Mitrovic", "Janko Lisjak"
Main Sub-contractors: "Jedinstvo", "Novi Kolektiv",
"Gradjevinar", "Progres"
The Purpose of the Project: Water supply to the municipalities
of: Arilje, Pozega, Lucani, Cacak and Gornji Milanovac.
Years of Construction: 1988-1993
|
|
RAW WATER tapping from the water intake on the Rzav river
and transport to the water treatment plant; raw water
purification up to the drinking water quality and pure water
distribution in five directions (gravitational pipeline to 4
consumers and displacement pipeline to one consumer).
§
Temporary water intake of raw water - raw water pipeline
Ø 1,200 mm and raw water pumping station capacity
Q = 1,300 1/s; water treatment plant capacity Q = 1,300 1/s
(pre-chlorination, coagulation, flocculation, sedimentation,
ozonization, filtration, disinfection,
fluoridation); pure
water pipelines: reinforced concrete pipelines Ø 1,200 mm, Ø 1,000 mm
and Ø 800 mm, in the length of 20,300 m; steel pipelines
Ø 1,100, Ø 1,000, Ø 800, Ø 500 and Ø 600 mm in the length
of 50,500 m, and cast iron pipelines Ø 500 and Ø 300 in the
length of 500 m.
|