Main Designer: V. Misita, BSc (civil eng.) -
"Energoprojekt"
Main Designer of individual stages: B.
Petrovic, BSc (civil eng.) structures
Designed by: "Energoprojekt - Hidroinzenjering"
Main Contractor: KMG "Trudbenik"
Main Sub-contractors: "Energoprojekt", "Mostogradnja", "Ratko
Mitrovic", "Janko Lisjak"
The Purpose of the Project: Production of the Healthy Drinking
Water
Years of Construction: 1985-1987
|
|
TO SUPPLY the town of Belgrade with water, the purification
plant "Makis" was designed and constructed to process the
Sava river water into drinking water.
§ The first stage is of the capacity 2
m3/s. On the basis of the technological treatment process, the plant consists of the
following
individual structural units: input structure, raw water pumping
station "Sava", divisional pool, pre-treatment and clearing,
ozonization, filter service building, pure water reservoir,
pure watt pumping station, aerator, mud treatment, chemical building,
pumping station for balancing reservoir re-circulation,
control-laboratory centre.
§ In order to meet very strict functional requirements due to
non-uniform subsidence, the main structures of the filter line,
clearing and ozone filters, were founded on the "Franci" piles
dia 520 mm, length 15 m.
|