G - Hydro-Engineering Projects

MAKIS WATER PURIFICATION PLANT - Belgrade

Construction information


Main Designer: V. Misita, BSc (civil eng.) - "Energoprojekt"
Main Designer of individual stages: B. Petrovic, BSc (civil eng.) structures 
Designed by: "Energoprojekt - Hidroinzenjering"
Main Contractor: KMG "Trudbenik"
Main Sub-contractors: "Energoprojekt", "Mostogradnja", "Ratko Mitrovic", "Janko Lisjak"
The Purpose of the Project: Production of the Healthy Drinking Water 
Years of Construction: 1985-1987
  

Project information

 
TO SUPPLY the town of Belgrade with water, the purification plant "Makis" was designed and constructed to process the Sava river water into drinking water.

§ The first stage is of the capacity 2 m3/s. On the basis of the technological treatment process, the plant consists of the following 
individual structural units: input structure, raw water pumping station "Sava", divisional pool, pre-treatment and clearing, ozonization, filter service building, pure water reservoir, pure watt pumping station, aerator, mud treatment, chemical building, pumping station for balancing reservoir re-circulation, control-laboratory centre.

§ In order to meet very strict functional requirements due to non-uniform subsidence, the main structures of the filter line, clearing and ozone filters, were founded on the "Franci" piles dia 520 mm, length 15 m.
                 

Related photos

Hydro-Engineering Projects - MAKIS WATER PURIFICATION PLANT - Belgrade
Hydro-Engineering Projects - MAKIS WATER PURIFICATION PLANT - Belgrade
Hydro-Engineering Projects - MAKIS WATER PURIFICATION PLANT - Belgrade

©2001 - 2006 YUBuild Group. All rights reserved. Legal information.
E-mail our webmaster if you have questions or problems regarding this Web site.