G - Hydro-Engineering Projects

HADITHA HYDRO-ELECTRIC POWER PLANT - Iraq

Construction information


Main Designer: Aleksandar Bozovic, BSc (civil eng.)
Main Designer of individual stages: Dragon Vasic, BSc (civil eng.) 
Designed by: "Energoprojekt", Institute for Water Management "Jaroslav Cerni" (model test)
Main Contractor. "Hidrogradnja"
Main Sub-contractors: "Metalna", "Rode Koncar", "Litostroj" 
Purpose of the Project: Multipurpose Use of Water
Years of Construction: 1981-1987
  

Project information

 
THE HADITHA dam on the Euphrates is rock filled, with a dolomite central core and an asphalt-concrete diaphragm. The project is a gravity dam with dam machine building and the main outlet weir overflows the building. On its left and right hand side bottom outlets are symmetrically placed. Downstream from the machine building and the overflow is the stilling 
pool. The bottom outlets have separate stilling pools. Such a block plan of the project meant considerable savings, and at the same time made the constructors build in an unconventional way. The aim of the clam with accumulation - to provide irrigation, to produce electric power and to control extreme flooding.
- height of the building 78.1 m, 
- width of the building 88.0 m, 
- length of the building 191.5 m, 
- dam crest length 8,700 m,
- quantity of built in concrete 1,060,000 m3,
- quantity of built-in reinforcement 70,000 tons, 
- overflow capacity 13,478 m3/s.
- six weir overflows with total width 134 m, 
- two bottom outlets about 4,300 m3/s,
- rated power 660 MW.
              

Related photos

Hydro-Engineering Projects - HADITHA HYDRO-ELECTRIC POWER PLANT - Iraq
Hydro-Engineering Projects - HADITHA HYDRO-ELECTRIC POWER PLANT - Iraq

©2001 - 2006 YUBuild Group. All rights reserved. Legal information.
E-mail our webmaster if you have questions or problems regarding this Web site.