Main Designer: Aleksandar Bozovic, BSc (civil eng.)
Main Designer of individual stages: Dragon
Vasic, BSc (civil eng.)
Designed by: "Energoprojekt", Institute for Water Management
"Jaroslav Cerni" (model test)
Main Contractor. "Hidrogradnja"
Main Sub-contractors: "Metalna", "Rode Koncar", "Litostroj"
Purpose of the Project: Multipurpose Use of Water
Years of Construction: 1981-1987
|
|
THE HADITHA dam on the Euphrates is rock filled, with a
dolomite central core and an asphalt-concrete diaphragm.
The project is a gravity dam with dam machine building and
the main outlet weir overflows the building. On its left and
right hand side bottom outlets are symmetrically placed. Downstream
from the machine building and the overflow is the stilling
pool. The bottom outlets have separate stilling pools. Such a block
plan of the project meant considerable savings, and at the same time
made the constructors build in an unconventional way. The aim
of the clam with accumulation - to provide irrigation, to
produce electric power and to control extreme flooding.
- height of the building 78.1 m,
- width of the building 88.0 m,
- length of the building 191.5 m,
- dam crest length 8,700 m,
- quantity of built in concrete 1,060,000 m3,
- quantity of built-in reinforcement 70,000 tons,
- overflow capacity 13,478 m3/s.
- six weir overflows with total width 134 m,
- two bottom outlets about 4,300 m3/s,
- rated power 660 MW.
|