Construction information
|
|

|
|
Main Designers: Aleksandar Bozovic, BSc (civil eng.) and
Tricko Trickovic, BSc (civil eng.) -
"Energoprojekt"
Main Designers of individual stages: Dusan
Suvajdzic, BSc (civil eng.);
Dragan Vasic, BSc (civil eng.); Dusko
Pavicevic, BSc (civil eng.) - "Energoprojekt"
Designed by: "Energoprojekt - Hidroinzenjering"
Other Designing Bureaus: "Elektroprojekt"
Main Contractor: GP "Hidrotehnika"
Other partners in manufacture, delivery and assembly of
equipment: "Jaroslav Cerni",
"Vodogradbeni Laboratorij", Institute for
Material Testing of Serbia, "Geosonda", GOSA, GIK
"Crna Gora", GP "Mostogradnja", Kombinat
aluminijuma, "Litostroj", "Metalna",
"Rade Koncar", "Servisimport",
"Jugoelektro", "Zetatrans"
Purpose of the Project: Hydropower Project
Years of Construction: 1971-1976
|
|

|
|
Project information
|
|

|
|
THE HYDROELECTRIC power station is located on the river Piva
in Montenegro, about 10 km upstream from the confluence of
the Tara and the Piva, in the narrowest part of the Piva
canyon, about 2.85 km downstream from the Mratinje brook after
which the dam was named. The width of the riverbed at dam site
does not exceed 25 m, and the canyon is about 100 m high, with
exceptionally steep sides (60-80%).
§
By creating the accumulation a complete yearly levelling of
the Piva waters has been achieved.
D It is a concrete arch clam, with double curve of variable
thickness. The hydroelectric power station is an accumulation
dam-type plant with relatively short supply and the machine
building in the left part of the canyon, downstream from the
dam.
§
Characteristics:
- dam crest length 201 m,
- maximum clam height 220 m,
- installed flow 3x80 m3/s,
- rated power 3x120 MW,
- annual production of electricity E=860 GWh,
- total vol. of accumulation V=880x10 million m3,
- basin area 1,757.7 km2,
- useful vol. of accumulation 790x10 million m3,
- outlet capacity 1,670 m3/s.
|
|
 |
|