Main Designers: Miodrag Corovic, BSc (civil eng.) and Ilija
Lazarevic, BSc (civil eng.)
- Structure: Zivota Nikolic, BSc (civil eng.) and
Miodrag Popovic, BSc (civil eng.)
- Geotechnical part: Gvozden Sandic, BSc (geol.)
- Geology: Janko Obradovic, DSc (geol.)
- Mechanical part: Predrag Crnkovic, BSc (mech. eng.)
- Electrical part: Fran Bratusa, BSc (electr.)
Designed by: "Energoprojekt"
Employer: Hydroelectric Power Station "Bajina Basta"
Main Contractor: GP "Hidrotehnika - Hidroenergetika"
Main Sub-contractor: "Geosonda" (injection works)
Purpose of the Project: Production of Electricity
Years of Construction: 1976-1983
|
|
REVERSIBLE pumping plant "Bajina Basta" is the second phase
of the hydroelectric power station system "Bajina Basta". On
the mountain of Tara two rock-filled dams were built which
form the accumulation of 150x10 million m3.
§ "Lazici" are the rock-filled dams with clay core, 125 m high
in the canyon and 45 m on the saddle. The inflow-outflow tunnel
through Mt Tara, from the accumulation to the machine building
is 8 km long, pale opening 6,3 m and steel pipeline 42/48 m of
1400 m length. The surge tank has dia 12 m and is 140 m high,
with two bottom and two upper chambers, dia 6 to 10 m, length
65 m each. The machine building is dug-in and its dimensions
are 90x40 m and 38 m high. The bottom entry-exit structure with the
well chamber and the hole 7x16 m is in the concrete dam
"Bajina Basta".
§ Other important characteristics:
- open pit excavation 560,000 m3,
- embankments 3,650,000 m3,
- total concrete 170,000 m3,
- reinforcement 3,300 tons,
- height of pumping 600 m,
- rated power 600 MW.
|