BAJINA BASTA HYDRO-ELECTRIC POWER PLANT - The Drina, Perucac

Construction information


Author and Main Designer: Aleksandar Bozovic, BSc (civil eng.)
Main Designers of individual stages: structure: Tricko Trickovic, BSc (civil eng.), geology: Ljubinko Ubavic, BSc (geology, machine part: Zoran Ivanovic, BSc (mech. eng.), electrical part: Fran Bratusa, BSc (electr.) 
Designed by: "Energoprojekt"
Employer: Joint Electric Power Management of Serbia 
Main Contractor: GP "Hidrotehnika - Hidroenergetika"
Main Sub-contractors: GOSA (hydromechanical equipment); "Geotehnika" (injection works)
Purpose of the Project: Production of Electricity 
Years of Construction: 1959-1966
  

Project information

 
THE GRAVITY concrete hollow dam 90 m high, 461 m long in the crest, forms the accumulation lake 50 km long with the capacity of 340x10 million m3. The mechanical building is located on the right bank of the Drina river and its dimension is 111x33 m 24 m high. The rated power is 348 MW, and the average annual production is 1 620x10 million kWh. The maximum overflow capacity is 10,600 m3/s through five weir overflows.

§ The accumulation lake has become a well known tourist attraction in this region.
- Earth excavation for the structures 1,480,000 m3 
- Concrete for dam and other structures 99,000 m3 
- Built-in hydrodynamic equipment about 2,150 tons
  

Related photos

Hydro-Engineering Projects - BAJINA BASTA HYDRO-ELECTRIC POWER PLANT - The Drina, Perucac

©2001 - 2006 YUBuild Group. All rights reserved. Legal information.
E-mail our webmaster if you have questions or problems regarding this Web site.