Author and Main Designer: Aleksandar
Bozovic, BSc (civil eng.)
Main Designers of individual stages: structure:
Tricko Trickovic, BSc (civil eng.), geology:
Ljubinko Ubavic, BSc (geology, machine part:
Zoran Ivanovic, BSc (mech. eng.), electrical part:
Fran Bratusa, BSc (electr.)
Designed by: "Energoprojekt"
Employer: Joint Electric Power Management of Serbia
Main Contractor: GP "Hidrotehnika - Hidroenergetika"
Main Sub-contractors: GOSA (hydromechanical
equipment); "Geotehnika" (injection works)
Purpose of the Project: Production of Electricity
Years of Construction: 1959-1966
|
|
THE GRAVITY concrete hollow dam 90 m high, 461 m long in
the crest, forms the accumulation lake 50 km long with the
capacity of 340x10 million m3. The mechanical building is
located on the right bank of the Drina river and its dimension
is 111x33 m 24 m high. The rated power is 348 MW, and the
average annual production is 1 620x10 million kWh. The maximum
overflow capacity is 10,600 m3/s through five weir overflows.
§ The accumulation lake has become a well known tourist
attraction in this region.
- Earth excavation for the structures 1,480,000
m3
- Concrete for dam and other structures 99,000
m3
- Built-in hydrodynamic equipment about 2,150 tons
|