G - Hydro-Engineering Projects

DJERDAP TWO HYDRO-POWER AND WATERWAY SYSTEM

Construction information


Main Designers: F. Svortsov, BSc (civil eng.) - ISPH, Bucurest; Vukadin Djordjevic, BSc (civil eng.) and Mirjana Tucovic BSc (civil eng.) - "Energoprojekt"
Main Designers of individual stages: ISPH - Bucurest: I. Popa, BSc; C. Boca, BSc; I. Lefter, BSc. "Energoprojekt": M. Njezic, BSc (civil eng.); B. Petrovic, BSc (civil eng.); M. Matic BSc (civil eng.); T. Nikolovski, BSc (civil eng.); Zoran Savic, BSc (civil eng.); M. Boljsakov, BSc (civil eng.). 
Designed by: ISPH - Bucurest and "Energoprojekt"
Main Contractors: Romanians 
Sub-contractors: Romanians
Purpose of the Project: Hydropower and Navigational System
Years of Construction: 1977-1983
 

Project information

 
THE DAM is located on the Danube, 80 km downstream from Djerdap I, or about 17 km upstream from the river Timok mouth into the Danube, between Romania and Serbia .
The main project consists of two power plants, two waterlocks (310 m long and 14 m wide), two overflow dams, two non-overflow dams and a road across the dam. There is a provision for building a railway Line.

§ The clam itself is between the Romanian island Mare and the Yugoslav river bank. The secondary dam in this system is located on the drainage 875 km on Gogos branch of the river and connects the upstream part of Mare island with the Romanian river bank. Besides the production of electricity this clam regulates the navigation between Djerdap I and Djerdap II. For the protection of the riparian zone the following has been done:
- embankments and drainage system to protect Grabovicko polje (1200 ha)
- embankments, drainage system and other technical measures to protect the town of Kladovo;
- reconstruction of existing roads, electrical works, telephone lines, etc.;
- relocation of parts of settlements (Mihailovac, Brza Palanka, Vajuge);
- structures which prevent entering of deposits into the accumulation lake.

§ Basic characteristics:
- dam crest length 1,088 m,
- dam height 32 m,
- rated power of the plant 432 MW, 
- number of turbines 16,
- mean annual production of electricity 2,5 billion KWh
- installed flow of the power plant 6,800 m3/s,
- medium head 7,45 m.
                

Related photos

Hydro-Engineering Projects - DJERDAP TWO HYDRO-POWER AND WATERWAY SYSTEM
Hydro-Engineering Projects - DJERDAP TWO HYDRO-POWER AND WATERWAY SYSTEM

©2001 - 2006 YUBuild Group. All rights reserved. Legal information.
E-mail our webmaster if you have questions or problems regarding this Web site.