Construction information
|
|

|
|
Designed by: "Energoprojekt" and ISPH - Bucurest, Romania
Main Designer: Vukadin Djordjevic BSc, "Energoprojekt"
Other Designing Bureaus: "Lengidrostal" - Leningrad, Russia;
"Gidroprojekt" - Moscow, Russia; Institute "Jaroslav Cerni"
Main Designeres of individual stages: "Energoprojekt" with the
following group of engineers (BSc): Vlade Vracaric (DSc), Prof. Petar
Petrovic, Mirjana Tucovic, Branko Semiz, Nedeljko Ribar, Fran Bratusa,
Aleksandar Konstantinovic, Relja Zivojinovic, Milutin
Jevremovic, Vojin Buckovic, Ilija Lazarevic, Vitomir Babovic, Slobodan
Cubrilo, Miroslava Tomasevic-Nikic and Aristid Gligic
Main Contractors:
A) Civil engineering works: "Hidrotehnika", "Hidrogradnja", ICH
Bucurest - Romania, PIM, "Hero] Pinki",
"Jugofund", DTD, "Stig"
B) Equipment and erection: Leningradski Metaliceskoi Zavod -
Leningrad, Russia, "Litostroj", "Bade Koncar", "Elektrosila" -
Leningrad, ACEA - Sweden, "Minel", Sprecer and
Schuh, Switzerland, GOSA, "Metalna", Krupp - Germany, Uzimeexport -
Bucurest, Romania, "Ivo Lola Ribar", "Progres-Invest", "Mihailo Pupin",
"Prva Petoletka", "14. Oktobar", MIN
Sub-contractors and other partners:
A) Civil engineering works: "14. December", "Delo", "Biljur",
"Lesnina", "Automobilsko", "Beton", "Geotehnika", "Djuro
Salaj", "Jadran"
B) Equipment and erection: Institute "Nikola Tesla", "Pobeda",
"Elvod", "Iskra", "Teletra" - Italy, BBC - Switzerland, "Siemens" -
Germany, "Terma" - Denmark, "Hidromontaza", "Vojvodina", "Cinkarna",
"Transped", "Antikor"
The Purpose of the Project: Hydropower and Navigational System
Years of construction: 1964-1972
|
|

|
|
Project information
|
|

|
|
IT IS A CONCRETE gravity clam, with 14 weir overflows, 25 m
wide each. In Europe it is the largest project of this type
excluding Russia, and it is one of the largest in the world.
The plant is located on the Danube river, upstream from
Kladovo, between Romania and Serbia , 943 km upstream from the
Danube estuary into the Black Sea.
§ Its block plan is symmetrical and consists of
two waterlocks (each 310 m long and 34 m wide), two power plants and an over-flow
dam in the centre. Across the dam a road is built for vehicular
traffic. There is a provision for building a railway line.
Besides the production of the electricity, the navigation on the Danube in
the length of over 100 km is regulated. For the protection of the
riparian zone 120 km of embankment was reconstructed and
strengthened, and new 30 km were built. The drainage systems
were made for about 130,000 ha. The capacity of all pumping
stations is 130,8 m3/s. The protection of settlements, public
and other buildings was performed in Kostolac, Veliko Gradiste,
Smederevo, Kovin, Pancevo, Umka, Beograd and Novi Beograd.
The protection of accumulation was also performed
(afforestation, torrent regulation) on the larger part of the accumulation
area. Railway lines, roads and ports were relocated and
reconstructed.
§ Basic characteristics:
- dam crest length 1,280 m,
- max height of the dam 60,6 m,
- number of installed units 2x6,
- rated power of the plant 2,1 MW,
- number of power plants 2,
- annual production of electricity 11,5 billion KW,
- installation flow of the power plant 8,700 m3/s,
- medium head 27,17 m,
- average flow of the Danube on the dam 5,520
m3/s,
- outlet structures capacity 22,500 m3/s,
- annual capacity of the water-locks 25 million tons.
|
|
 |
|