G - Hydro-Engineering Projects

THE DANUBE-THE TISA-THE DANUBE WATER SYSTEM

Construction information


Designed by: Water Management Company "Dunav-Tisa-Dunav", Designing Bureau "Hidrozavod"
Author of the Design: Nikola Mirkov, BSc (civil eng.) 
Other Designing Bureaus: Institute for Water Management "Jaroslav Cerni", River Traffic Designing Bureau, "Hidsoprojekt", "Geoistrazivanja", PP "Trasa", "Mostogradnja", GP "Partizanski put", Civil Engineering Faculty, "Elektrosrbija", "Hidrobiro", Designing Bureau Vojvodina, Institute for Town Planning APV, and many others
Main Designers of some structures and individual stages: Coordination of the Project, its preparation management and its editing by: Dimitrije Milovanov, BSc (civil eng.); Zarko Suput, BSc (civil eng.) and Milenko Radonic, BSc (civil eng.).
Designers of other parts: N. Kocis and A. Rostislavov (drainage); A. Cernisevski (external joints); V. Suput (channel network); M. Marjanov (economy of Vojvodina); M. Bojic (navigation); D. Kornicer 
(hydroenergy); P. Sumanovac (irrigation); Z. Vladisavljevic (amelioration); Lj. Vajda 
(dam on the Tisa) and many other participants from scientific and industrial circles/professions.
Main Contractors: Subsidiary Co. "Dunav-Tisa-Dunav" responsible for construction works; "Kanal", "Ivan Milutinovic" (PIMA, GP "Hidrotehnika", "Mostogradnja", "Planum", GIK "Banat", "Vijadukt", "Hidrogradnja", "Pinki", and others
Equipment and Erection: "Metalna", GOSA, "Ivo Lola Ribar", "Masinska industrija Nis", Institute "Mihajlo Pupin", "Djuro Djakovic", "Litostroj", "Elektrosrbija", Railway transport companies, and many others.
Purpose of the Project: Hydrotechnical Ameliorations and Navigational System
Years of construction: 1958-1976
  

Project information

 
THE WATER SYSTEM the Danube - the Tisa - the Danube is a unique hydroengineering system for flood control and usage water (hydrotechnical, amelioration forestry, water supply, waste water evacuation, navigation, fishing, hunting, tourism). One of the largest complex systems built in Europe after the Second World War. It covers the northern part of Serbia - the territory of Vojvodina, with the total area of about 12,700 km2. The total length of the dug main canals is 960 km, including new and old canals and streams which were completely or partially reconstructed and thus included in the new system. In the basic canal network there are 51 structures - 24 gates, 16 waterlocks (for navigation 1,000 to 1,300 tons capacity), 5 safety gates, 6 pumping stations, and 180 bridges. This network allows drainage of about 700,000 ha and irrigation of about 50,000 ha. 
Potentially navigation is possible on 664 km of canals. The navigational canals are second to fourth category according to EEC categorisation. There are 14 goods ports on the canals. On 
the new canals of the water system the Danube-the Tisa-the Danube there were built: 84 bridges - 62 carriageway, 19 railway and 3 pedestrian ones. One of the most important structures within this water system is the dam on the river Tisa near Novi Becej which regulates the water regime in the basic canal network in Banat, for irrigation of about 300,000 ha. It is a concrete dam with 7 weir overflows and well chambers 24.x8,0 m. It includes the waterlock of dimensions 85.0x12.0x3.0 m. The total dimension of the concrete dam part is about 214.0 m. The capacity of the outlet structures on the dam is Q0.3% = 4,70 m3/s.
 

Related photos

Hydro-Engineering Projects - THE DANUBE-THE TISA-THE DANUBE WATER SYSTEM
Hydro-Engineering Projects - THE DANUBE-THE TISA-THE DANUBE WATER SYSTEM