|
Author: "IMEL" with its members
Main Designers, Structure and Installation Designs by:
"IMEL" with its members, Designing Bureau Architecture and Town Planning,
Institute for Architecture and Town Planning of the Faculty of
Architecture, Designing Bureau "Napred", Institute of Material
Testing of Serbia, "Pobeda", "Elektron", Designing Bureau
"Komgrap", and others
Employer: Apartment Building Co "Metalac" - groups B, C, E, F,
G; Belgrade Resident Community - groups A, D
Main Contractor: "JINPROS"
Sub-contractors: GP "Napred", GP "7. juli", GK "Komgrap", GP
"Ratko Mitrovic", GP "Dom" and KMG "Trudbenik"
Years of Construction: 1980 -1990
|
|
THE HOUSING ESTATE was carried out in the IMS skeleton and
panel system (industrial assembly system), classical building
by syporex blocks, as well as cast concrete structure.
The complex consists of residential buildings, transformer
station, sub-stations, shelters etc. The buildings vary in their height ranging
one floor to groundfloor plus four floors plus an attic.
|