|
Author: N. I. Guljevic, BSc (arch.)
Interior Designer: N. Krstit, BSc (arch.)
Structure Designer: E. E. Boldirijey, BSc (civil eng.)
Installation Designer: Ivanov, BSc
Designed by: "Mosprojekt I" - Moscow
Employer: "Inturist" Holding Co. - Moscow
Contractors: "Unioninzenjering", KMG "Trudbenik", "Termovent" IBM
Year of Construction: 1996
|
|
THE HOTEL has 25 floors, the area of 56,000
m2 and the volume of 220,000 m3. The capacity of the hotel is 1,064 beds, 150 seats in restaurants and bars, and a multipurpose hall with 500
seats. The hotel has an indoor swimming pool with recreational centre, modern heating installations,
air-conditioning, signalisation, fire and burglary protection.
§ The hotel is built with reinforced concrete structure and it is equipped according to the highest European standards.
|