|
Authors: M. A. Orlov, BSc (arch.), D. K.
Gubarjevic, BSc (arch.), N. A.
Morduneeva, BSc (arch.)
Designer: S. Milkovic, BSc (arch.)
Structure Designers: V. Noskov, BSc (civil eng.),
E. Stanuljevic, BSc (civil eng.)
Installation Designer: N. Luneva, BSc
Designed by: CNIEP
Employer: "Tehnostrojexport" and "Glavinturs"
Contractor: "Unioninzenjering"
Year of Construction: 1982
|
|
THE HOTEL has a total of 2,557 beds. The "Dagomis" range has
1,662 beds, "Olympiskaya" 497 beds, and "Meridijan" 238 beds.
§
The beach can accommodate 2,000 persons approximately
and the swimming pools 200.
§
The cinema concert hall has 1000 seats.
|