|
Authors and Designers: Goran Popin, BSc (arch.),
Aleksandar Djordjevic, BSc (arch.), Nikola
Grujic, BSc (civil eng.), Mihailo Jon, BSc
(arch.), Zoran Radosevic, BSc (mech.),
Dragan Simoric, BSc (electr.)
Structure Designers: "Arkon" and "Prednapregnuti beton"
Employer: Institute for Physical Medicine and Rehabilitation
"Dr Simo Milosevic"
Contractor: GP "Rad", GP "Prvoborac", "Komgrap"
Years of Construction: 1982-1986
|
|
THE CONSTRUCTION of the second phase of the Institute implies
three buildings - bays of the total area 64,000
m2, plus therapeutic, hotel and sports-recreational part.
§
The therapeutic part with the ground floor and three floors
has adequate pools, 48 rooms for different therapies, clinics for
medical specialists, therapy premises, central pharmacy,
laboratories, and swimming pools with sea and mineral water.
§
The hotel part has 900 rooms and suites for the patients.
§
The building for social activities, sports and recreation has
a restaurant with 3,000 seats, a seminar hall with 250 seats, a
post office, a hairdressing shop, an indoor swimming pool, sports
hall.
|