|
Author: Janko Zivancevic, BSc (arch.)
Designer: Janko Zivancevic, BSc (arch.)
Structure Designers: Slobodanka Kracun, BSc (civil eng.); roof
structure: Milorad Komnenovic, BSc (civil eng.)
Installation Designers: "Janko Lisjak"; mechanical and water
supply and
sewage design: Novak Knezevic, BSc (mech. eng.),
Mihajlo Vasiljevic, BSc (mech. eng.) and
Ivan Jevtovic, BSc (civil eng.); lighting:
Rasko Jovanovic, BSc (electr.), Branko
Boskovic, BSc (electr.) and Bruno
Zlobec, BSc (electr.)
Designed by: "Invest-biro", Designing and Engineering Co.
Employer: Manufacturing construction-building association
"Permstrointer" - Perm, Russia
Contractor: "Agrovojvodina-Komercservice", "Ratko
Mitrovic", "Janko Lisjak" and
"Svetlost"
Year of Construction: 1992 (beginning of building works)
|
|
OUTSIDE the centre of Perm, near the natural lake, a sports
complex was designed to cater for the physical and spiritual
recreation of modern people. The design won the first prize
at the international tender 1991.
§
The complex has a horseshoe pattern and with the existing
buildings of the Cultural Centre and cinema forms a new town
square, with the tower and the clock in the
middle.
§
A free access to the complex from all directions allows a
quick gathering and evacuation of visitors. The designed ring-shape
communications are minimum in number, functional, efficient,
economic, and by their arrangement enable undistracted
movement of competitors and spectators.
§
The main arena is a polyvalent hall with 7,600 seats which is
technically designed of all types of public manifestations.
§
The total area of the building is 45,000 m2 and it contains
an Olympic swimming pool with stands for 1,600 spectators, a
diving pool height 3.5 and 7.5 m, pool for children, restaurant with
200 seats, disco club, trade centre, concert-sports hall with 7,600
seats, basket and volley ball hall with 900 seats, shooting range,
automatic bowling hall, press centre and other supporting
premises, like sauna, solarium, massage, etc.
§
The complex can accommodate at one moment 12.000 people,
which is in fact one whole town. Therefore, there are all
necessary conditions to monitor. the events and movement of people from
the control centre which is in the "heart" of the complex.
§
The control centre is connected with each and every point of
the building via the computer (audio and visual). This enables
an instant warning of thefts and burglary, fire and other
irregularities. This control centre is attached to the power block.
|