Author: Leh Robacinski, BSc (arch.)
Structure Designer: Milenko Popovic, BSc (civil eng.), "Architecture, bureau 71"
Installation Designer: "Monter"
Designer: "Trudbenik" - Bureau
"Dragisa Brasovan"
Designed by: Bureau 71, KMG "Trudbenik"
Employer: Municipality of the city of Warsaw
and Wadeco, Consulting Services Co.
Contractor: "Generalexport"
Sub-contractors: "Ingrad", "Monter", "Tapex"
Year of Construction: 1992
|
|
THE DESIGNING started in 1950s. The construction had been interrupted several times until 1986 when "Generalexport" was awarded as main Contractor in the international tender. First a reconstruction was executed as well as an adaptation of the skeleton built 20 years ago. After that the works were continued on building a business area of 40,000
m2 with five floors in the low part 25 m high, and 29 floors in the main part of the tower 100 m high. It is built out of steel structure with the facade in aluminum and glass.
§ The business centre consists of four banks, exhibition and artistic galleries, and a number of offices and executive offices equipped according to the highest world standards. The modern engineering-technical installations are automatically regulated and controlled from the computer centre. Within the tower there is an underground garage, too.
|